Putting up the forms

The truck pulled up with forms on it and were lowered into the building site. The forms are made of plywood. They are spaced 10 inches apart with steel rods spacing them. The cement will be poured down into the forms and will attach to the rods, which will be inside the walls. After the formed cement walls have solidified the forms will be peeled off and we will have concrete walls. On the footers, they carved out indentations and the cement will pour down into those indentations, like putting Tab A into Slot B.



This is a couple days later when all of the forms are up and ready.